M40 Traffic

M40 Traffic News

1Accidentsreported on the M40 — see details2Roadworks activelive on the M40 right now — see details22Plannedscheduled on the M40 — see details

Live M40 traffic data from National Highways · updated 03:37 Sat 26 Sept 2026

M40

M40 Maps and Junctions

The M40 is 89 miles long, so we split it into six stretches. Each has its own page with the junctions, the towns they serve, the latest reports and the traffic count for that part of the road.

Search all the latest M40 traffic news →

Latest accident or incident on the M40

The most recent accident or incident on the M40 that we are aware of.

  • M40 Westbound Jct 1A to M25 Clockwise and Anti-Clockwise Jct 16 Link and Slip Road Closure

    Active nowUpdateAnticlockwise Road closed
    Time now: Saturday, 26 September 2026, 03:37

    03:2626 Sept 2026reported 11 min ago

    Location
    link road from M40 J1A northbound to M25 J16 anti-clockwise
    Direction
    Anticlockwise
    Lanes closed
    Carriageway closed
    Reason
    Repair work
    Schedule
    23:00 Fri 25 Sept 2026 → 05:30 Sat 26 Sept 2026
    ⏳Expected to clear in ~1h 52m HA planned end: 05:30 Sat 26 Sept 2026
  • Latest active roadworks on the M40

    Roadworks live on the M40 right now.

  • A46 northbound from M40 Jct 15 (exit slip and roundabout) to A46 entry slip road closure

    Active nowRoadworksNorthbound Road closed
    Time now: Saturday, 26 September 2026, 03:37

    03:2626 Sept 2026reported 11 min ago

    Location
    M40 J15 southbound exit (after fast slip)
    Direction
    Northbound
    Lanes closed
    Carriageway closed
    Reason
    Roadworks
    Schedule
    21:03 Fri 25 Sept 2026 → 06:00 Sat 26 Sept 2026
    ⏳Expected to clear in ~2h 22m HA planned end: 06:00 Sat 26 Sept 2026
  • + 1 more active roadworks - search all M40 traffic news →

    Latest planned roadworks on the M40

    The next planned roadworks scheduled on the M40.

  • M40 Southbound Jct 11 to Jct 10 lane 3 and 2 closure

    PlannedRoadworksSouthbound
    Time now: Saturday, 26 September 2026, 03:37

    03:2626 Sept 2026reported 11 min ago

    Location
    M40 southbound between J11 and J10
    Direction
    Southbound
    Lanes closed
    Lane closures
    Reason
    Maintenance work
    Schedule
    20:00 Sat 26 Sept 2026 → 06:00 Sun 27 Sept 2026

    Forecast - not confirmed

    🚧HA scheduled: 20:00 Sat 26 Sept 2026 → 06:00 Sun 27 Sept 2026 starts in about 16 hours · lasts ~10h 00m
  • + 21 more planned roadworks - search all M40 traffic news →

    Road closed — on the overhead signs now

    National Highways’ overhead signs are showing a road closure, as at 03:37 Sat 26 Sept 2026.

    • M40 J4-J2 CLOSED

      On the signs now Road closed
      Time now: Saturday, 26 September 2026, 03:37

      02:2326 Sept 2026set 1 hr ago✓ Checked by us 03:37

      M40 J4-J2
      CLOSED

      Overhead Message

      WhereM40 southbound, J12 to J5 · on 11 signs
      Also onAlso showing on A43 signs
      SinceOn the signs since at least 22:05 Fri 25 Sept 2026
      We check these overhead signs at least every five minutes, but we can't guarantee a sign is still current if an incident or issue has been cleared and the sign has not been updated yet. Signs and news can each carry something the other does not - check both before you travel.

    See all the M40 overhead signs →

    Search all the latest M40 traffic news →

    Updated 03:37 Sat 26 Sept 2026

    Powered by National Highways’ Transport Data Feeds.

    The six stretches

    The six stretches compared

    The busiest main-line count on each stretch, from the Department for Transport road traffic statistics, 2025, in vehicles a day:

    StretchBusiest countWhere
    Junctions 1 to 4136,403J1A to J2
    Junctions 4 to 7100,922J5 to J6
    Junctions 7 to 992,005J7 to J8
    Junctions 9 to 11100,293J9 to J10
    Junctions 11 to 1489,483J11 to J12
    Junctions 14 to 16 and the M42113,433J14 to J15

    The London stretch is clearly the heaviest, and the Warwick stretch is the busiest north of the Chilterns. The Oxford stretch includes the quietest main-line count on the road, 70,986 between Junctions 8 and 9.

    The full junction list

    For every junction number in one place, with the roads and towns each one serves, see the map of M40 motorway junctions.

    Using a stretch page

    Each stretch page shows the reports affecting that part of the M40 above, with the fixed information — what the junctions connect, and how much traffic the Department for Transport counted there in 2025 — underneath. It is the quickest way to check the part of the road you use most.

    For the whole motorway at once, see the latest M40 traffic news.

    Traffic count figures on this page are from the Department for Transport road traffic statistics, 2025.

    M40traffic.co.uk is dedicated to the M40 between London and Birmingham. Heading on to the orbital? Try M25 Traffic; for the Birmingham end see M42 Traffic.