M40 Traffic

M40 Traffic News

0Accidentsnone reported on the M40 that we are aware of3Roadworks activelive on the M40 right now — see details13Plannedscheduled on the M40 — see details

Live M40 traffic data from National Highways · updated 16:32 (4:32pm) Fri 6 Nov 2026

M40

M40 Junctions 9 to 11: Bicester and Banbury

North of Oxford the M40 runs through the Cherwell valley, past Bicester to Banbury. More than one vehicle in ten between Junctions 9 and 10 is a lorry. Reports for these junctions are shown below.

The junctions on this stretch

How busy is this stretch?

M40 Junctions 9 to 11 — Bicester and Banbury: vehicles a day, stretch by stretch
StretchAll vehiclesLorriesShare lorries
J9 to J10100,29310,70810.7%
J10 to J1188,6188,5759.7%

© M40Traffic.co.uk · Statistics from the Department for Transport

Junction 9 to 10 is back above 100,000 vehicles a day once the A34 has joined. It carries more traffic away from London than towards it: 56,031 northbound against 44,262 southbound. Some of that traffic leaves again at Junction 10 for the A43.

Between Junctions 10 and 11 the Department for Transport lists five count points, one for each section between council boundaries, all with the same figure of 88,618. It appears here once.

The A43 connection

Junction 10 is the M40’s link to the A43, signed for Northampton and Milton Keynes. The difference between the two sides of the junction — 100,293 vehicles a day south of it, 88,618 north of it — is the clearest sign in the counts of how much traffic joins or leaves here. For the M1, see M1 Traffic.

When this stretch opened

The M40 north of Oxford was one of the last parts of the motorway to be built. The 48-mile section that closed the gap opened in January 1991.

Previous stretch: Junctions 7 to 9, Oxford. Next: Junctions 11 to 14, Gaydon and Leamington.

Traffic count figures on this page are from the Department for Transport road traffic statistics, 2025.

Live traffic news at M40 Junctions 9 to 11

Incidents and roadworks between Junction 8 and Junction 12 that we are aware of.

  • M40 southbound Jct 10 to Jct 9 hard shoulder closure

    Active nowRoadworksSouthbound
    Time now: Friday, 6 November 2026, 16:32 (4:32pm)

    16:17 (4:17pm)6 Nov 2026reported 15 min ago

    Location
    M40 southbound between J10 and J9
    Direction
    Southbound
    Lanes closed
    Hard shoulder closed
    Reason
    Tree and vegetation cutting work
    Schedule
    21:00 (9pm) Thu 5 Nov 2026 → 23:59 (11:59pm) Fri 6 Nov 2026
    ⏳Expected to clear in ~7h 26m HA planned end: 23:59 (11:59pm) Fri 6 Nov 2026
  • + 8 more near Junctions 9 to 11 - see all the M40 traffic news →

    This is the news for Junctions 9 to 11 only, not the whole M40. For the rest of the motorway see all the latest M40 traffic news, the overhead signs and the speed limits in force now.

    Updated 16:32 (4:32pm) Fri 6 Nov 2026

    M40traffic.co.uk is dedicated to the M40 between London and Birmingham. Heading on to the orbital? Try M25 Traffic; for the Birmingham end see M42 Traffic.