M40 Junctions 9 to 11: Bicester and Banbury
North of Oxford the M40 runs through the Cherwell valley, past Bicester to Banbury. More than one vehicle in ten between Junctions 9 and 10 is a lorry. Reports for these junctions are shown below.
Search all the latest M40 traffic news →
Latest accident or incident on the M40
The most recent accident or incident on the M40 that we are aware of.
M40 Westbound Jct 1A to M25 Clockwise and Anti-Clockwise Jct 16 Link and Slip Road Closure
03:2626 Sept 2026reported 11 min ago
- Location
- link road from M40 J1A northbound to M25 J16 anti-clockwise
- Direction
- Anticlockwise
- Lanes closed
- Carriageway closed
- Reason
- Repair work
- Schedule
- 23:00 Fri 25 Sept 2026 → 05:30 Sat 26 Sept 2026
Latest active roadworks on the M40
Roadworks live on the M40 right now.
A46 northbound from M40 Jct 15 (exit slip and roundabout) to A46 entry slip road closure
03:2626 Sept 2026reported 11 min ago
- Location
- M40 J15 southbound exit (after fast slip)
- Direction
- Northbound
- Lanes closed
- Carriageway closed
- Reason
- Roadworks
- Schedule
- 21:03 Fri 25 Sept 2026 → 06:00 Sat 26 Sept 2026
+ 1 more active roadworks - search all M40 traffic news →
Latest planned roadworks on the M40
The next planned roadworks scheduled on the M40.
M40 Southbound Jct 11 to Jct 10 lane 3 and 2 closure
03:2626 Sept 2026reported 11 min ago
- Location
- M40 southbound between J11 and J10
- Direction
- Southbound
- Lanes closed
- Lane closures
- Reason
- Maintenance work
- Schedule
- 20:00 Sat 26 Sept 2026 → 06:00 Sun 27 Sept 2026
Forecast - not confirmed
+ 21 more planned roadworks - search all M40 traffic news →
Road closed — on the overhead signs now
National Highways’ overhead signs are showing a road closure, as at 03:37 Sat 26 Sept 2026.
M40 J4-J2 CLOSED
Time now: Saturday, 26 September 2026, 03:3702:2326 Sept 2026set 1 hr ago✓ Checked by us 03:37
M40 J4-J2
CLOSEDOverhead Message
WhereM40 southbound, J12 to J5 · on 11 signsAlso onAlso showing on A43 signsSinceOn the signs since at least 22:05 Fri 25 Sept 2026We check these overhead signs at least every five minutes, but we can't guarantee a sign is still current if an incident or issue has been cleared and the sign has not been updated yet. Signs and news can each carry something the other does not - check both before you travel.
Search all the latest M40 traffic news →
Updated 03:37 Sat 26 Sept 2026
Powered by National Highways’ Transport Data Feeds.
The junctions on this stretch
- Junction 9 — the A34 for Oxford and Newbury, and the A41 for Bicester and Aylesbury.
- Junction 10 — the A43 for Northampton and Milton Keynes, and Cherwell Valley services.
- Junction 11 — the A422 and A361 for Banbury, Brackley and Daventry.
How busy is this stretch?
| Stretch | All vehicles | Lorries | Share lorries |
|---|---|---|---|
| J9 to J10 | 100,293 | 10,708 | 10.7% |
| J10 to J11 | 88,618 | 8,575 | 9.7% |
Junction 9 to 10 is back above 100,000 vehicles a day once the A34 has joined. It carries more traffic away from London than towards it: 56,031 northbound against 44,262 southbound. Some of that traffic leaves again at Junction 10 for the A43.
Between Junctions 10 and 11 the Department for Transport lists five count points, one for each section between council boundaries, all with the same figure of 88,618. It appears here once.
The A43 connection
Junction 10 is the M40’s link to the A43, signed for Northampton and Milton Keynes. The difference between the two sides of the junction — 100,293 vehicles a day south of it, 88,618 north of it — is the clearest sign in the counts of how much traffic joins or leaves here. For the M1, see M1 Traffic.
When this stretch opened
The M40 north of Oxford was one of the last parts of the motorway to be built. The 48-mile section that closed the gap opened in January 1991.
Previous stretch: Junctions 7 to 9, Oxford. Next: Junctions 11 to 14, Gaydon and Leamington.
Traffic count figures on this page are from the Department for Transport road traffic statistics, 2025.
