M40 Junctions 4 to 7: Stokenchurch and the Chilterns
From Handy Cross at High Wycombe to Thame, this stretch carries the M40 over the Chiltern Hills and down into Oxfordshire. It includes the oldest part of the motorway. Reports for these junctions are shown below.
The junctions on this stretch
- Junction 4 — the A404 at Handy Cross, High Wycombe.
- Junction 5 — the A40 for Stokenchurch.
- Junction 6 — the B4009 for Watlington, Princes Risborough, Lewknor and Chinnor.
- Junction 7 — the A329 for Thame and Wallingford.
The Stokenchurch Gap
Just beyond Junction 5 the motorway passes through a deep cutting in the chalk of the Chiltern escarpment, known as the Stokenchurch Gap, where the road enters Oxfordshire. The cutting is 1,200 metres long and up to 47 metres deep, and runs through the Aston Rowant National Nature Reserve. It was built in the early 1970s.
The area is known for frequent heavy fog in winter, which is worth remembering on an early journey. Red kites, reintroduced to the Chilterns, are often seen overhead.
A little history
The first section of the M40 to open, in June 1967, ran from Handy Cross to Stokenchurch, Junctions 4 to 5. The motorway was extended from Junction 5 to Junction 8 at Great Milton in 1974.
How busy is this stretch?
| Stretch | All vehicles | Lorries | Share lorries |
|---|---|---|---|
| J4 to J5 | 99,611 | 6,646 | 6.7% |
| J5 to J6 | 100,922 | 8,311 | 8.2% |
| J6 to J7 | 95,958 | 6,528 | 6.8% |
© M40Traffic.co.uk · Statistics from the Department for Transport
Traffic holds close to 100,000 vehicles a day over the hills. The lorry share rises to 8.2% between Junctions 5 and 6. The Department for Transport records the Junction 5 to 6 stretch at two count points either side of a council boundary with the same figure; it appears once.
Previous stretch: Junctions 1 to 4. Next: Junctions 7 to 9, Oxford.
Traffic count figures on this page are from the Department for Transport road traffic statistics, 2025.
Live traffic news at M40 Junctions 4 to 7
Incidents and roadworks between Junction 3 and Junction 8 that we are aware of.
M40 northbound Jct 3 to Jct 4 hard shoulder closure
04:56 (4:56am)10 Nov 2026reported just now
- Location
- M40 northbound between J3 and J4
- Direction
- Northbound
- Lanes closed
- Hard shoulder closed
- Reason
- Tree and vegetation cutting work
- Schedule
- 10:20 (10:20am) Sun 1 Nov 2026 → 23:59 (11:59pm) Wed 11 Nov 2026
+ 11 more near Junctions 4 to 7 - see all the M40 traffic news →
This is the news for Junctions 4 to 7 only, not the whole M40. For the rest of the motorway see all the latest M40 traffic news, the overhead signs and the speed limits in force now.
Updated 04:57 (4:57am) Tue 10 Nov 2026
