M40 Traffic

M40 Traffic News

1Accidentsreported on the M40 — see details2Roadworks activelive on the M40 right now — see details22Plannedscheduled on the M40 — see details

Live M40 traffic data from National Highways · updated 03:37 Sat 26 Sept 2026

M40

M40 Junctions 14 to 16: Warwick to the M42

The last stretch of the M40 runs from Warwick past Henley-in-Arden to the M42 at Junction 3A, south of Birmingham. Reports for these junctions are shown below.

Search all the latest M40 traffic news →

Latest accident or incident on the M40

The most recent accident or incident on the M40 that we are aware of.

  • M40 Westbound Jct 1A to M25 Clockwise and Anti-Clockwise Jct 16 Link and Slip Road Closure

    Active nowUpdateAnticlockwise Road closed
    Time now: Saturday, 26 September 2026, 03:37

    03:2626 Sept 2026reported 11 min ago

    Location
    link road from M40 J1A northbound to M25 J16 anti-clockwise
    Direction
    Anticlockwise
    Lanes closed
    Carriageway closed
    Reason
    Repair work
    Schedule
    23:00 Fri 25 Sept 2026 → 05:30 Sat 26 Sept 2026
    ⏳Expected to clear in ~1h 52m HA planned end: 05:30 Sat 26 Sept 2026
  • Latest active roadworks on the M40

    Roadworks live on the M40 right now.

  • A46 northbound from M40 Jct 15 (exit slip and roundabout) to A46 entry slip road closure

    Active nowRoadworksNorthbound Road closed
    Time now: Saturday, 26 September 2026, 03:37

    03:2626 Sept 2026reported 11 min ago

    Location
    M40 J15 southbound exit (after fast slip)
    Direction
    Northbound
    Lanes closed
    Carriageway closed
    Reason
    Roadworks
    Schedule
    21:03 Fri 25 Sept 2026 → 06:00 Sat 26 Sept 2026
    ⏳Expected to clear in ~2h 22m HA planned end: 06:00 Sat 26 Sept 2026
  • + 1 more active roadworks - search all M40 traffic news →

    Latest planned roadworks on the M40

    The next planned roadworks scheduled on the M40.

  • M40 Southbound Jct 11 to Jct 10 lane 3 and 2 closure

    PlannedRoadworksSouthbound
    Time now: Saturday, 26 September 2026, 03:37

    03:2626 Sept 2026reported 11 min ago

    Location
    M40 southbound between J11 and J10
    Direction
    Southbound
    Lanes closed
    Lane closures
    Reason
    Maintenance work
    Schedule
    20:00 Sat 26 Sept 2026 → 06:00 Sun 27 Sept 2026

    Forecast - not confirmed

    🚧HA scheduled: 20:00 Sat 26 Sept 2026 → 06:00 Sun 27 Sept 2026 starts in about 16 hours · lasts ~10h 00m
  • + 21 more planned roadworks - search all M40 traffic news →

    Road closed — on the overhead signs now

    National Highways’ overhead signs are showing a road closure, as at 03:37 Sat 26 Sept 2026.

    • M40 J4-J2 CLOSED

      On the signs now Road closed
      Time now: Saturday, 26 September 2026, 03:37

      02:2326 Sept 2026set 1 hr ago✓ Checked by us 03:37

      M40 J4-J2
      CLOSED

      Overhead Message

      WhereM40 southbound, J12 to J5 · on 11 signs
      Also onAlso showing on A43 signs
      SinceOn the signs since at least 22:05 Fri 25 Sept 2026
      We check these overhead signs at least every five minutes, but we can't guarantee a sign is still current if an incident or issue has been cleared and the sign has not been updated yet. Signs and news can each carry something the other does not - check both before you travel.

    See all the M40 overhead signs →

    Search all the latest M40 traffic news →

    Updated 03:37 Sat 26 Sept 2026

    Powered by National Highways’ Transport Data Feeds.

    The junctions on this stretch

    How busy is this stretch?

    StretchAll vehiclesLorriesShare lorries
    J14 to J15113,4339,6788.5%
    J15 to J1694,0419,74810.4%
    J16 to M42 J3A96,6728,1858.5%

    Junction 14 to 15 is the busiest stretch of the M40 outside Buckinghamshire, at 113,433 vehicles a day, with the A46 carrying traffic on to Coventry and Stratford. At the M42 interchange the Department for Transport counts the two link roads separately, at 51,574 and 47,908 a day.

    Active Traffic Management

    Active Traffic Management is used on the approach to the M42 at the northern end of the M40. The overhead signs there can set the speed limit and open or close lanes; see M40 speed limits now and M40 overhead signs.

    The first Birmingham section

    Construction of the northern M40 began at Warwick in October 1987. The 12-mile section between the M42 and Warwick opened in December 1989, a little over a year before the rest of the extension was finished.

    Beyond the M40

    For the M42 round the south and east of Birmingham, see M42 Traffic. For the M6 beyond it, see M6 Traffic.

    Previous stretch: Junctions 11 to 14. All stretches: M40 maps.

    Traffic count figures on this page are from the Department for Transport road traffic statistics, 2025.

    M40traffic.co.uk is dedicated to the M40 between London and Birmingham. Heading on to the orbital? Try M25 Traffic; for the Birmingham end see M42 Traffic.